I have had a 2000w dust extractor now for many years. It's got a 4" hole, but I have attached a reducing thing to bring it down to 2.5"
All the fixed tubing is then 2.5", a 20' central run with a 10' branch and two 6' branches. This may then be reduced to 2" for the tools.
My question, is this the most efficient setup, or would I be better off to run all the fixed tube in 4" and then reduce to the required size at the last minute?
I hope that makes sense :?
All the fixed tubing is then 2.5", a 20' central run with a 10' branch and two 6' branches. This may then be reduced to 2" for the tools.
My question, is this the most efficient setup, or would I be better off to run all the fixed tube in 4" and then reduce to the required size at the last minute?
I hope that makes sense :?