I assembled and glued everything in a project last night at around 5 and left everything in my garage overnight to dry / cure, intending to thickness plane everything this morning. When I assembled everything the temperature was around 13-14 C but last night, after around 5 hrs, the temp dropped to around 5C and I didn’t realise it had. This morning I brought the work (chopping board) into the house in the hope that if the glue hadn’t dried, the warmer temperature would help.
The glue is Titebond 2.
Can I trust this glue up to not fall apart when I put it through the thicknesser? I know that it’s all supposed to be good to go after 30 mins but I’m not sure that the low temperature hasn’t messed with the curing.
Can any of you more experienced guys please advise?
The glue is Titebond 2.
Can I trust this glue up to not fall apart when I put it through the thicknesser? I know that it’s all supposed to be good to go after 30 mins but I’m not sure that the low temperature hasn’t messed with the curing.
Can any of you more experienced guys please advise?