Sgian Dubh
Established Member
A recent project now creating brown stains on a concrete patio. Apart from the snap, more information here. Odds and sods of offcuts for the underframe and a bit of air dried oak purchased for the table top. All in all just over £100 for materials. Construction was a variety of M&Ts, draw-bored dowels and polyurethane glue-- no nails or other metal apart from the pocket holed deck screws holding the top to the undeframe. It should last two or three decades before it shows real signs of rot. Slainte.