Hi, I have some stairs to make to fit tight between a wall and studwork but the last four treads at the bottom carry on clear of studwork finishing with a bullnose first tread. This last section is to have an Oak turned newel and some spindles. My question is how to finish this section where the string carries on up between the walls. The handrail and base rail need some kind of finish point. If it was a landing situation it would be a half newel but that doesn't work. I can only think of a second full size newel just clear of the end of studwork but base of turning would need to go down to the floor that's ok but the outside stair string is continuous to the bottom newel and bullnose.
Any opinions or experience of this would be appreciated.