caretaker
Established Member
I am going to put a small path to my greenhouse, this is what I have.
14 half size paving slabs.
3 bags sand.
1 bag cement.
Now the problem is I am getting on in age 70 and would like to make it a bit easy, I am thinking to mix the sand and cement together then lay it dry on the path area.
Placing slabs on top, then make up a bucket of wet mix and fill between the slabs the next day.
Will this work as I have never done it dry but thinking of my health.
Reg
14 half size paving slabs.
3 bags sand.
1 bag cement.
Now the problem is I am getting on in age 70 and would like to make it a bit easy, I am thinking to mix the sand and cement together then lay it dry on the path area.
Placing slabs on top, then make up a bucket of wet mix and fill between the slabs the next day.
Will this work as I have never done it dry but thinking of my health.
Reg