mailee
Established Member
I came to a stop today as the mirror hasn't arrived for the bathroom cabinet yet and I need to check some details with the oak wardrobe customer.....so, I started work on my next commission which is a cabinet to box a boiler in. This was a job from the customer with the small gate. It is just a simple two sided affair which will fit into a corner and cover the boiler and pipework. I had enough spare MRMDF so got to work. By this evening I had it built ready to hinge the door and then apply some finish to it.
Oh, I also have to route some slots in the plinth and the top too, Almost forgot that.
Oh, I also have to route some slots in the plinth and the top too, Almost forgot that.