What would be the best voltage to get? Would I be allowed to use a 240v on site (even though I am not doing that sort of stuff...) I have some 110v stuff anyway. Is 240v better because the transformer will plug into the vac and have a spare output on the transformer.
All help appreciated
All help appreciated