Update on dresser project.

UKworkshop.co.uk

Help Support UKworkshop.co.uk:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

REN

Established Member
UKW Supporter
Joined
28 Apr 2021
Messages
58
Reaction score
75
Location
Keighley
Never intended to be a quick build. The bottom half is finished and installed. Work has already started on the upper parts and photos will be posted soon. Constructed out of solid ash ans beech it was heavy to move!
 

Attachments

  • CCB48E7D-C85B-41DA-9980-833B509D2A53.jpeg
    CCB48E7D-C85B-41DA-9980-833B509D2A53.jpeg
    1.7 MB · Views: 0
  • 4C82B56A-7730-44A0-9603-C0AC561D4563.jpeg
    4C82B56A-7730-44A0-9603-C0AC561D4563.jpeg
    1.6 MB · Views: 0
  • 56386CDC-380D-4ACB-A8F1-5B04EF2B38FB.jpeg
    56386CDC-380D-4ACB-A8F1-5B04EF2B38FB.jpeg
    1.3 MB · Views: 0

Latest posts

Back
Top