ok so technically this is to do with my wainscoting nightmare/project. But I thought it warranted a new thread as its also to do with making mouldings in general.
I want to run an oak dado all around the top of the wainscoting to tie in with the oak furniture we have ordered. The MDF comes 18mm above the top batton, leaving a gap. I thought this would make it easy to secure the dado. So this is what is swimming around in my head:
If I had some 40mmx40mm oak I think I could probably make this up using the TS and Router Table. Thing is will 40x40mm oak cost the earth? I do now have a dewalt p/t but it's still in the box. I'm not sure I have enough time at the moment to work out how to use it.
I'd really apprecieate some comments on this. 3 weeks til meltdown :shock: :-s #-o
I want to run an oak dado all around the top of the wainscoting to tie in with the oak furniture we have ordered. The MDF comes 18mm above the top batton, leaving a gap. I thought this would make it easy to secure the dado. So this is what is swimming around in my head:
If I had some 40mmx40mm oak I think I could probably make this up using the TS and Router Table. Thing is will 40x40mm oak cost the earth? I do now have a dewalt p/t but it's still in the box. I'm not sure I have enough time at the moment to work out how to use it.
I'd really apprecieate some comments on this. 3 weeks til meltdown :shock: :-s #-o