Cartlodge - SE for foundation design in Essex?

UKworkshop.co.uk

Help Support UKworkshop.co.uk:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
A cautionary tale, make sure when digging out for a raft the ground worker/digger driver understands the arrangement:

View attachment 168343

Gave the GW's a plan, section and details for the raft and left them to it, went back 2 weeks later to catch up and they had dug the whole site out a meter deep, we then had to spend a couple of weeks using salvaged scaffold boards shuttering it all up and back filling to get back close to square 1, and it still took 7 * 8 yard concrete lorries to pour the raft, over engineered to say the least.
Lovely looking building that by the way, I would love to work on that sort of design
 
Back
Top