Recent content by Jony*5

UKworkshop.co.uk

Help Support UKworkshop.co.uk:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. J

    Ready to kit out my workshop ... It's taken 3years to get here

    Update on machinery i might go with after talking to a few people..... Bottom end .... Record Ts2 / PT300 / Sabre 350 ~£8K (apparently PT300 is essentially a JPT JET310HH for a grand less?) Hammer equiv £1x ?
  2. J

    Ready to kit out my workshop ... It's taken 3years to get here

    Hi, exactly the same, but i had to underpin my house 3m. The roof is rated for 0.75m of garden back on top and a 1.5Tn point load incase I want to drive a jcb over it too. It's in waterproof concrete so no tanking issues. Let me upload some photos later today when I have a little more time :)
  3. J

    Ready to kit out my workshop ... It's taken 3years to get here

    Thanks for the heads up on BPI. Any other url links to useful sites would be appreciated. Im not 100% sure what im going to do in my garage/shed/bunker, but it will probably include making shelves/storage units/doors/tables for starters. Im after some welding gear too so everything needs to be...
  4. J

    Ready to kit out my workshop ... It's taken 3years to get here

    3ph is not an option unless an inverter is a possibility, I guess you could convert 32A single phase to xA 3 phase with an inverter? Is that a costly option?
  5. J

    Ready to kit out my workshop ... It's taken 3years to get here

    All the electrics were buried in the poured concrete walls at 50mm deep. I have 10 double 13a all around the perimeter and 2 32A in the middle of 2 opposing walls. Floor/Walls/Roof all cast concrete, no insulation except in my lockup room (2.5mx6m)
  6. J

    Ready to kit out my workshop ... It's taken 3years to get here

    Spiral would be preferable, if only for the reduction in noise!
  7. J

    Ready to kit out my workshop ... It's taken 3years to get here

    I bougth 100 2 years ago, 20 are buried in concrete underpinning, the rest are supporting my 8" thick concrete roof for 28days whilst it dries out.
  8. J

    Ready to kit out my workshop ... It's taken 3years to get here

    Hi. I've been building a garage for 3 years and finally got the (concrete) lid on it. All my tools are in the house and now its time to move them out and buy some big power tools... My garage is slightly larger than 6m x 7m and I dont think it will see a vehicule in it any time soon. A...
Back
Top