Hi all,
I am getting ready to install a wooden floor on top of the concrete slab in my garage, I'm going to use the Cabershield 22MM chipboards that come with a finished top coating.
My plan was to batten the floor with 50X50 battens at 300MM centers, put 50MM PIR boards in between and put the floor boards on top.
I know I have to leave 10MM around the edges of the floor boards for expansion, can I still drill the battens to the concrete floor? Wouldn't that stop the floor from expanding if the boards are glued to the battens (was planning to use the D4 glue)
Can (or should) I fill the gaps between the floor and wall with a cell foam or something else for insulation?
There's a DPM underneath the concrete slab, do I need another on on top before I start with the flooring?
Any help would be greatly appreciated.
Cheers!
Ferenc
I am getting ready to install a wooden floor on top of the concrete slab in my garage, I'm going to use the Cabershield 22MM chipboards that come with a finished top coating.
My plan was to batten the floor with 50X50 battens at 300MM centers, put 50MM PIR boards in between and put the floor boards on top.
I know I have to leave 10MM around the edges of the floor boards for expansion, can I still drill the battens to the concrete floor? Wouldn't that stop the floor from expanding if the boards are glued to the battens (was planning to use the D4 glue)
Can (or should) I fill the gaps between the floor and wall with a cell foam or something else for insulation?
There's a DPM underneath the concrete slab, do I need another on on top before I start with the flooring?
Any help would be greatly appreciated.
Cheers!
Ferenc