Hi all
First post, but I have been reading a lot...
I've building a workshop like Mike's plans (thanks ). I'm expecting windows to be delivered next week and I'm just wondering about the detail at the top of the window and closing the gap between the stud wall and the cladding.
My wall build up is
Stud wall
House wrap
Vertical timber batten
horizontal feather board
I assume I can't just put a horizontal timber across as this would prevent any water draining from behind. So, do I need some kind of flashing? If, so what should I be looking for?
Thanks for any tips
First post, but I have been reading a lot...
I've building a workshop like Mike's plans (thanks ). I'm expecting windows to be delivered next week and I'm just wondering about the detail at the top of the window and closing the gap between the stud wall and the cladding.
My wall build up is
Stud wall
House wrap
Vertical timber batten
horizontal feather board
I assume I can't just put a horizontal timber across as this would prevent any water draining from behind. So, do I need some kind of flashing? If, so what should I be looking for?
Thanks for any tips