Search results

UKworkshop.co.uk

Help Support UKworkshop.co.uk:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. G

    New workshop build

    I was pretty much expecting this comment and was reluctant to even do an update, sorry I did now, I think I'll leave it at that.
  2. G

    New workshop build

    I decided to go with sloped walls rather than the firring strips on the roof. It was actually much easier than I thought. I just marked the walls up with chalk lines on the floor and then lined up and cut my studs from this.
  3. G

    New workshop build

    Well it's been a while since my last update but I've made some progress in the last couple of weeks. Weather has been rubbish and I'm working on my own but here I've got the walls framed out and erected. IMG-5077 by Gerard Barrett, on Flickr Here is with the roof timbers going up. IMG-5080 by...
  4. G

    New workshop build

    I was thinking it would be most use when getting the bottom plate square. I'll be using a double bottom plate with the first plate anchored into the concrete (I know a brick plinth is better :wink: ) but this is how I decide to go, it'll have a dpm under it and the cladding will extend below it.
  5. G

    New workshop build

    I was reading through Steve Maskery's brilliant workshop build thread the last few days and came across his square of Thales. Since I'm still waiting for my timber to arrive, I decide to make one and what a great tool it is. I think it's going to be of great assistance when it comes to layout...
  6. G

    DBT85s Workshop - Moved in and now time to fit it out

    Super progress, great to see.
  7. G

    New workshop build

    Well I’m in Ireland so not much use to you. It was €90 per cubic metre.
  8. G

    New workshop build

    Overall height at the moment I’ve got at 2967, that’s without the firring strips. I have to work out how to measure those to get the desired fall. Got a call from timber yelled today though to say there is a delay with my order, it was supposed to be here today but looking like next Monday now...
  9. G

    New workshop build

    Sorry Mike, I didn't explain that very well. I didn't mean I would taper cut the actual roof joists. I meant using another 9x2 (or whatever size is required) to cut the firring strips from, then attach these firring strips to the top of the joists.
  10. G

    New workshop build

    My tables suggest that isn't strong enough. Your choice. Thanks Mike, if that's the case, it's just going to have to be 10x2's. With regards the firring strips, could you do it with a circular saw? I'm thinking 60:1 for the fall (or would 80:1 be ok). Could you just run down a length of 10x2...
  11. G

    New workshop build

    Well I figured out how to do pictures :D thanks to DBT85 for the help.
  12. G

    New workshop build

    662EF173-9AC9-4540-B883-FE13F3241091 by Gerard Barrett, on Flickr 72FADF2C-82B9-45B0-831E-2C4D3B978AFE by Gerard Barrett, on Flickr
  13. G

    New workshop build

    CDC21AE0-F7F7-481C-A8C0-A4354C1C4B02 by Gerard Barrett, on Flickr
  14. G

    New workshop build

    Plan was to go with 9x2’s (220mm) and they come in 5.4m lengths where I’m buying my timber, above that size and as you say, they get pricey. Is it just a matter of doing a taper cut the full length of the 9x2 to make the firring strips?
  15. G

    New workshop build

    Well I got the base in, unfortunately I haven't figured out how to add pictures here yet, I think the file size is too big. Anyway base consists of compacted hardcore, sand blinding, dpm, 100mm board insulation followed by 5" of concrete pour. Thinking ahead to the wall framing and the roof...
  16. G

    DBT85s Workshop - Moved in and now time to fit it out

    Well I went for it and bought from power tool world, should have it mid next week hopefully. Anyway sorry for hijacking your thread, concrete was poured today on my own build, I'll post a photo on the thread i started for mine. Thanks again.
  17. G

    DBT85s Workshop - Moved in and now time to fit it out

    Lol, I hope to be finished with it myself by then. That is a super price at FFX but they are saying delivery by 1st July, 3 weeks, I'm not waiting that long. Have you tried it out yet? Let us know what you think.
  18. G

    DBT85s Workshop - Moved in and now time to fit it out

    What model is it, DCN692P2? I'm in Ireland and the best price I can see for one new is 685euro (around £610), that's with two 5Ah batteries and the charger.
  19. G

    DBT85s Workshop - Moved in and now time to fit it out

    Looking great. Is that a framing nailer I see in the box. I’ve been browsing for one myself the last couple of days but struggling to find a decent second hand one. They’re very pricey new if you’ve not already got batteries and a charger.
Back
Top