Recent content by steve158

UKworkshop.co.uk

Help Support UKworkshop.co.uk:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. S

    LED downlights too bright - can I dim?

    Joe I think you will find that the "Neutral" is actually the live feed. If so the electrician should have put brown sleeving around it. The other 2 wires should be the switched feeds to the fittings
  2. S

    Planer Thicknesser, Bandsaw and Lathe purchase advice

    Been following this topic as I was in 2 minds about whether to get an Axminster or Laguna Bandsaw. Went for the Laguna 14BX from Biven Machinery which unfortunately is on back order because joel4mo got there first!! :LOL:
  3. S

    Advanced Socket Tester

    In my area, London and the South East, it would not have been the DNO (UKPN) who arranged for the isolator as this would be the responsibility of the company who supply your electricity. Even so, the earth loop impedance should have been recorded and reported if not within spec ie. above 0.35...
  4. S

    Advanced Socket Tester

    Bussy is quite correct. The DNO is only responsible for the supply up to the cutout, the electricity supply company for the connection between the cutout and the meter. Any equipment after the meter is the responsibility of the property owner. An earth fault loop reading, a voltage reading and a...
  5. S

    Planning Permission - any cautionary tales of woe and despondency?

    Just a quick word on the power to the building, you will need to notify the local department as it comes under the Part P regulations. If you get a registered electrician to do the connection he will be able to notify and certify it for you.
  6. S

    16 Amp supply for bandsaw

    Oh I see, I get concerned when I see simplistic approaches such as changing the mcb for a higher rating. I incorrectly assumed that you were not aware that this would be notifiable work as required by Part P.
  7. S

    16 Amp supply for bandsaw

    What do you mean by a competent person? It seems to me that you are going to do something without understanding the potential of such an action. It is unlikely that your shed is on a ring final circuit as you state.
Back
Top